Footpath renewal works on Chapman Road
/The City of Greater Geraldton wishes to advise that footpath renewal works will be carried out on a section of Chapman Road footpath between Smith Street and Davis Street, Bluff Point with works programmed to commence during the week of 4 January 2016 for a period of approximately 17 days.
The works include removing the 1.2m wide slab path and replacing it with a user friendly concrete path. The works will require some sections of the foot path and some driveways to be partially or fully closed at times to pedestrian and vehicle traffic.
These works are part of $1,175,739 allocated in the 2015/16 Budget for the renewal of footpaths which will see approximately 3kms of the footpath network replaced.
The anticipated hours of work will be between from 6am to 6pm.
The City requests motorists and pedestrians to exercise caution and obey all warning signs and direction from authorised City personnel and contractors.
The City regrets any inconvenience and will endeavour to keep disruptions to a minimum.
Please direct all enquiries to Mr Pino Faraone, on (08) 9965 6714 or 0409 378 242